OPTIMALISASI BEBAN KERJA MANPOWER DENGAN MENGGUNAKAN METODE WORK LOAD ANALYSIS PADA LOKASI PROGRAM ONSITE RESTORATION
Keywords:
Beban Kerja, Work Load Analysis, Restorasi, Tenaga Kerja, EfisiensAbstract
The On-site Restoration Program at PT. XYZ requires efficiency in workforce allocation to achieve optimal productivity. This study aims to measure employee workload and determine the required number of workers using the Work Load Analysis (WLA) method. The analysis was conducted on four types of restoration activities. The uniformity test results showed that all data were within acceptable control limits. The highest standard time was found in the plant tilling task, reaching 289,951 minutes per 3 months, while the lowest was 5,632 minutes per 3 months. Data processing results indicated that the workload of all workers exceeded the maximum threshold of 100% for an 8-hour workday. Based on the calculations, a total of 9 workers are required, while only 5 are currently employed. Additional workers are needed for fertilization, replanting, and invasive species cleaning tasks. Further adjustments are still necessary to align workload with worker capacity and field conditions.